Thursday, May 16, 2013

Skywalk install progress report

As the convention center nears completion, the skywalk is being installed this week. This will connect the convention center to its parking garage across 1st Av. I hope it will eventually connect to the main Skywalk System, though that would have to be done through the US Bank parking garage. (It will definitely connect to the 4th St. parkade, so in theory the Skywalk could be back to its original length, at this end anyway.)

As of this morning they are still in the "prep" stage. Here are some pictures I took before I came to work. Vantage point is the trail crossing at 4th St. (which can be for the time being made without anxiety, as 1st Av is closed for this operation)

The thing itself. A passerby remarked "it looks like they cut it a little long," but I think it has to fit into slots in the buildings.

 Wider view.

 The hole in the convention center where it will go.

Harder to see around the railroad crossing post, but this is where it goes into the parking garage.

Friday, May 17:

The skywalk's still on the street as of 8:00 this morning. They must have a lot of prep work to do.





It gives me a chance to show the machine they're using. I couldn't get a good shot of the whole thing, though.